Martinsburg, Wv
BORTON constructed Normal Clinker (Post Tensioned) Low Alkalai (Post Tensioned) and Off Spec clinker silos.  The Off Spec silo is located inside the Normal Clinker silo.  BORTON also constructed a Blending silo with bin bottom and bin deck floor, a Multi Cell cement silo with bin bottom and bin deck floor along with the mechanical systems, and four truck load outs.  Existing silos were refurbished, with dust collection systems and rail load outs.